3 October 2026Logistics
A site manager's checklist for steel delivery day
Before signing the delivery challan, count and measure a sample from the load — section size, length, and visible finish should match the purchase order, not just the invoice total.
Check the batch number against the mill test certificate the dealer provided at order time, and photograph any damage before the truck leaves.
Store the material on dunnage, off bare ground, especially for GI stock — even a short spell in standing water can start white rust before the material is even used.
Assign one person to sign off on delivery, not whoever happens to be free. A consistent inspector builds familiarity with what a good consignment looks like, and catches discrepancies a rotating crew member might wave through.
